Homepage Garage Wiki Register Community Calendar Today's Posts Search
#Camaro6
Go Back   CAMARO6 > CAMARO6.com General Forums > ZL1 Discussions


BeckyD @ James Martin Chevy


Post Reply
 
Thread Tools
Old 09-20-2016, 09:58 AM   #15
jesusmetal777
noob
 
jesusmetal777's Avatar
 
Drives: 2017 ZL1 M6
Join Date: Sep 2016
Location: Chicago west suburbs
Posts: 142
Quote:
Originally Posted by KLR ZL1 View Post
Soooo how much longer after that week?
Good question. Anyone remember how long QC took for the first few Gen 5 ZL1s that rolled off the line?
jesusmetal777 is offline   Reply With Quote
Old 09-20-2016, 12:15 PM   #16
mkorgan

 
Drives: 1970-1/2 Z-28, 2017 ZL1
Join Date: Sep 2012
Location: Sanford, Fl
Posts: 973
Quote:
Originally Posted by jesusmetal777 View Post
Good question. Anyone remember how long QC took for the first few Gen 5 ZL1s that rolled off the line?
First of all, congrats on your new ride. It should be awesome and I look forward to pics as soon as you get it. I am in the same position you are and have been told 4-6 weeks. I have no idea how accurate that is nor what that entails but it seems like an awful long time for QC.
mkorgan is offline   Reply With Quote
Old 09-20-2016, 09:20 PM   #17
jesusmetal777
noob
 
jesusmetal777's Avatar
 
Drives: 2017 ZL1 M6
Join Date: Sep 2016
Location: Chicago west suburbs
Posts: 142
Quote:
Originally Posted by mkorgan View Post
First of all, congrats on your new ride. It should be awesome and I look forward to pics as soon as you get it. I am in the same position you are and have been told 4-6 weeks. I have no idea how accurate that is nor what that entails but it seems like an awful long time for QC.
Thanks and congrats to you as well! I was told "by January," so that's 10 weeks. 4-6 weeks would be much better but yes, still seems like a long time. Maybe I'll go mine the camaro5 forums and see what I can dig up on the first Gen 5 ZL1s to roll off the line
jesusmetal777 is offline   Reply With Quote
Old 09-21-2016, 08:45 AM   #18
jesusmetal777
noob
 
jesusmetal777's Avatar
 
Drives: 2017 ZL1 M6
Join Date: Sep 2016
Location: Chicago west suburbs
Posts: 142
So it looks like the Gen 5 ZL1 had an official "hold at the factory that lasted 2 solid month (Feb & Mar 2012). The first units started production after lunch on 3/29/12 and rolled onto the trailer for shipment before end of day the next day 3/30/12. I doubt ours will crank out that quickly, since we can't parallel the Gen5 ZL1 production launch process to the Gen6, maybe a good guess for actual production is 1 week?

So can anyone else chime in on rough number of weeks we can expect to QC a new trim like this for a model with previous MYs?
jesusmetal777 is offline   Reply With Quote
Old 09-21-2016, 09:20 AM   #19
harmonyp
 
Drives: 2015 ZL1 Silver Ice Metallic Manual
Join Date: Oct 2013
Location: NorCal
Posts: 249
From my limited experience the dates at this point are a crap shoot. In end of September 2013 I signed a contract for a C7 Stingray from MacMulkin that had just moved to 3000 (Order accepted by production control). There were new constraints every week, cars held up and Bayed for months. I was told it could be anywhere from one to three months. By luck while many others had their cars held up, mine was in transit to me in 3 weeks.

Hold your breath, and cross your fingers - it's a nail biting ride from this point.
harmonyp is offline   Reply With Quote
Old 09-21-2016, 09:54 AM   #20
JustGeorge
ZL1 CRT 1 of 53
 
JustGeorge's Avatar
 
Drives: 2012 & 2017 ZL1's
Join Date: Jul 2010
Location: Phoenixville, PA
Posts: 968
Congratulations!!! I am so jealous. I’ve been dealer to dealer in SE PA looking for a dealership that has an allocation. And I cannot find one. I had one crazy one tell me that they did not get an allocation, but that they wanted me to put a deposit down. On a car you can not order for me? And this is the dealership I ordered my ’12 through. Very frustrating!
__________________
JustGeorge is offline   Reply With Quote
Old 09-21-2016, 02:30 PM   #21
tpmotorsports
 
tpmotorsports's Avatar
 
Drives: Camaros
Join Date: Dec 2014
Location: Tampa, FL
Posts: 250
I was part of the 10/12 production week (first run) last year. Its safe to anticipate a minimum 4 week QC hold since the ZL1 is new - some cars last year were held much longer.

Then Logistics/shipping take over and it was a mess. You won't know exactly where your car is located or if its at an off site repair facility.

The production codes and updates are not really meant to be end-user friendly since most people don't go to the trouble of ordering.

First build week is not necessarily a good thing. It simply means your car is first to the big parking lot.
When shipping started, its seemed like the last cars in where the first cars out.

ZL1's could be delivered in December, some January.
Becky is your best source - she has done this enough to have a pretty good idea of where your car is.

I am part of the Phase 1 allocation with a 10/17 TPW - dealer Stingray Chevrolet near Tampa.


__________________
'17 ZO6 - Watkins Gray Metallic
'17 911 4GTS - Carmine Red
'17 Bolt - Hyper Blue
'02 SS - 35th Anniversary Ed. - 645 miles
'89 IROC Z - 2500 miles
'73 Z28 - Survivor 36k miles
'69 RS/SS 496 - 631 HP 618 TQ
'67 SS - Alum. 406 under construction

Last edited by tpmotorsports; 09-21-2016 at 05:13 PM.
tpmotorsports is offline   Reply With Quote
Old 09-21-2016, 11:31 PM   #22
OminouSS

 
OminouSS's Avatar
 
Drives: Red Hot track candy
Join Date: Oct 2009
Location: NorCal
Posts: 1,092
I remember small things totally spinning the production of individual cars off track. Specifically, I wanted pretty stripes running down the middle of my camaro. Guys that started the same TPW as me got there cars a month before I did. Turns out the stripes took the car off-line for product placement for a spell before being finished (I kind of picture a kid playing with his hot wheels on those plastic tracks and taking his favorite car off the track for a make-believe tire change and then pushing it back into the race. No??).

It's exciting to be back in the game.
__________________
Baby born 11/08/16. Left birthing place 11/25/16. Arrived home 12/6/16: '17 Red Hot ZL1. Stock.
OminouSS is offline   Reply With Quote
Old 09-21-2016, 11:56 PM   #23
2doorrocket
 
2doorrocket's Avatar
 
Drives: Gas Guzzlers
Join Date: Feb 2014
Location: San Diego, CA
Posts: 168
I'm pretty excited my TPW is 10/17/16
__________________
Current Vehicles:
2016 Dodge Charger SRT Hellcat
2017 Dodge Challenger SRT Hellcat
2014 Jeep Grand Cherokee SRT
2016 Dodge Viper ACR Extreme
2017 Chevrolet Camaro ZL1

Previous Vehicles:
2016 Dodge Challenger SRT Hellcat (RIP)
2016 Chevrolet Corvette Z06
2015 Dodge Charger SRT Hellcat
2015 Dodge Challenger R/T 392 Scat Pack Shaker
2013 Dodge Viper GTS
2013 Dodge Viper GTS Launch Edition
2013 Jeep Grand Cherokee SRT
2013 Dodge Charger SRT
2013 Chevrolet Camaro ZL1
2012 Chevrolet Camaro ZL1
2012 Dodge Charger SRT
2011 Chevrolet Camaro 2SS/RS
2010 Chevrolet Camaro 2SS/RS
2doorrocket is offline   Reply With Quote
Old 09-22-2016, 07:05 PM   #24
jesusmetal777
noob
 
jesusmetal777's Avatar
 
Drives: 2017 ZL1 M6
Join Date: Sep 2016
Location: Chicago west suburbs
Posts: 142
Quote:
Originally Posted by 2doorrocket View Post
I'm pretty excited my TPW is 10/17/16
Congrats! Now you have to update your signature from "Order Pending" to "TPW 10/17/16"
jesusmetal777 is offline   Reply With Quote
Old 09-22-2016, 07:21 PM   #25
MarkZL1
 
Drives: 2017 Camaro 2SS
Join Date: Sep 2016
Location: So. California
Posts: 11
Quote:
Originally Posted by 2doorrocket View Post
I'm pretty excited my TPW is 10/17/16
When did you place your order. Is your car a M6?
MarkZL1 is offline   Reply With Quote
Old 09-22-2016, 08:12 PM   #26
NB2017ZL1

 
NB2017ZL1's Avatar
 
Drives: 2017 ZL1 10 Speed Hyper Blue
Join Date: Jul 2016
Location: Canada
Posts: 1,349
Lots of cars lining up for TPW 17! Let the games begin ! Congrats!!
__________________
2017 ZL1
NB2017ZL1 is offline   Reply With Quote
Old 09-28-2016, 09:44 PM   #27
penbralat
 
penbralat's Avatar
 
Drives: '15 Summit White ZL1
Join Date: Oct 2014
Location: Windermere, FL
Posts: 90
TPW - 10/31/2016; Halloween! I was hoping to be one of the first, 10/17/2016 but two weeks later isn't going to kill me I suppose.
Attached Images
 
penbralat is offline   Reply With Quote
Old 09-28-2016, 10:50 PM   #28
jesusmetal777
noob
 
jesusmetal777's Avatar
 
Drives: 2017 ZL1 M6
Join Date: Sep 2016
Location: Chicago west suburbs
Posts: 142
Quote:
Originally Posted by penbralat View Post
TPW - 10/31/2016; Halloween! I was hoping to be one of the first, 10/17/2016 but two weeks later isn't going to kill me I suppose.
Sweet
__________________
jesusmetal777 is offline   Reply With Quote
 
Post Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:03 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2026, vBulletin Solutions, Inc.