|
|
#967 |
![]() Drives: Chevrolet Camaro ss 1le Join Date: Jul 2022
Location: Irvine
Posts: 11
|
How do you check your order status?
|
|
|
|
|
|
#968 |
|
Love my Satin Steel LT-1!
Drives: 6-Speed LT-1... Join Date: Aug 2016
Location: Kentucky
Posts: 500
|
You can go go Chevy chat on the website, or the "order status" thread on the forum. You need your 6 digit order number/characters.
Link to order status thread: https://www.camaro6.com/forums/showt...06888&page=136
__________________
2022 SATIN STEEL LT1
6-Speed Man|Carbon Flash Wheels Technology Pkg|NPP|Satin Blk Pkg ZL1 Rock Guards|Red Knee Pad Set EOS Track Spoiler|EOS 1LE Splitter PBC LT1 engine built by Debi Lewis |
|
|
|
|
|
#969 |
|
Banned
Drives: i want a camaro Join Date: Aug 2019
Location: miami, the hottest place on earth
Posts: 407
|
|
|
|
|
|
|
#970 |
![]() ![]() ![]() Drives: 1969 Z28,1992 Z28,1994 Z28,1999 SS Join Date: Oct 2021
Location: Jamestown, ND
Posts: 1,154
|
If you read other threads besides this one, you will see guys receiving their 23’s. I picked up my 23 ZLE yesterday.
__________________
24 2SS 1LE, Riptide Blue, A10, PDR. Picked up 11/5/23, 560 miles.
23 ZLE Rapid Blue, M6. 6/27/22 TPW. Off assembly line on July 12th, 2022. To Dealer August 6th. Delivered August 8th. 129 miles. 99 SS Vert, Hugger Orange, A4, 806 miles 94 Z28, Black, M6, 595 miles 92 Z28, last car built at Van Nuys Plant, Red, A4, 125 miles www.last1992camaro.com 69 Z28, Dusk Blue, M4 29 Ford Business Coupe 28 Ford Pickup 24 GMC Denali 2500HD CCSB 4x4 22 Jeep Grand Cherokee 13 Ford F150 Crew Cab 4x4 |
|
|
|
|
|
#971 |
|
BLACK 2019 ZL1
Drives: 2007 COBALT, 2019 CAMARO ZL1 Join Date: May 2022
Location: B.C. Canada
Posts: 109
|
2023 CAMARO 1SS 1LE IN RADIANT RED TINTCOAT.
DEALER HAD ONE COMING IN AS A STOCK ORDER SO I SNATCHED IT UP AND LUCKED OUT, 3400 STATUS AND TPW OF AUGUST 15TH. MY ZL1 IS STILL SITTING AT 1100, UNFORTUNATELY. |
|
|
|
|
|
#972 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: 2018 Camaro 2SS A8 Join Date: Jul 2017
Location: East Tennessee
Posts: 13,152
|
On a related note, you might want to put a 2023 order in quickly or you'll risk never actually having a new Camaro, see what LeonardS, one of the first who took delivery of a 2023, said in the other order thread.
__________________
2018 Camaro 2SS — G7E MX0 NPP F55 IO6
735 rwhp | 665 rwtq Magnuson TVS 2300 80mm pulley | Kooks 1 7/8" LT headers | JRE smooth idle terminator cam | LT4 FS & injectors | TSP forged pistons & rods JMS PowerMAX | DSX flex fuel kit | Roto-Fab CAI | Soler 95mm LT5 TB | 1LE wheels | 1LE brakes | BMR rear cradle lockout | JRE custom tune 1100 - 1/30/18 | 2000 - 1/31/18 3000 - 2/06/18 TPW 2/26/18 3400 - 2/19/18 | 3800 - 2/26/18 4300 - 2/27/18 | 4B00 - 3/01/18 4200 - 3/05/18 | 4800 - 3/14/18 5000 - 3/16/18 | 6000 - 3/19/18 |
|
|
|
|
|
#973 | |
|
Banned
Drives: i want a camaro Join Date: Aug 2019
Location: miami, the hottest place on earth
Posts: 407
|
Quote:
and if i keep on thinking about it, im going to get a stomach ulcer and i dont want to get sick |
|
|
|
|
|
|
#974 |
|
sergecr7
Drives: chevrolet camaro 2.0 manual Join Date: Jun 2020
Location: canada
Posts: 60
|
my eta was 18/8 then 30/8 and now 11/9.my ss 1le was built july 4.its bs
|
|
|
|
|
|
#975 |
![]() Drives: 2022 Chevrolet Tahoe Join Date: Aug 2022
Location: East TN
Posts: 25
|
Feel like I got pretty lucky. Called my local dealer Saturday 8/6 to order a 2SS 1LE, they told me they had allocation for exactly what I wanted. Four days later and I am already at a 2500 status. Any idea how long it may take before I get my production date info? Thanks
__________________
2023 2SS 1LE 6MT Shadow Gray Metallic
Ordered 8/6/22 1100 8/6/22 2000 8/8/22 2500 8/10/22 3000 8/11/22 TPW 9/12 3400 8/29/22 |
|
|
|
|
|
#976 | |
|
Love my Satin Steel LT-1!
Drives: 6-Speed LT-1... Join Date: Aug 2016
Location: Kentucky
Posts: 500
|
Quote:
__________________
2022 SATIN STEEL LT1
6-Speed Man|Carbon Flash Wheels Technology Pkg|NPP|Satin Blk Pkg ZL1 Rock Guards|Red Knee Pad Set EOS Track Spoiler|EOS 1LE Splitter PBC LT1 engine built by Debi Lewis |
|
|
|
|
|
|
#977 |
![]() Drives: 2022 Chevrolet Tahoe Join Date: Aug 2022
Location: East TN
Posts: 25
|
I did post in there just to see if anything different comes up. Ive just been using the Chevrolet chat support the last couple of days. Just curious how long it may take before I actually know the possible production week.
__________________
2023 2SS 1LE 6MT Shadow Gray Metallic
Ordered 8/6/22 1100 8/6/22 2000 8/8/22 2500 8/10/22 3000 8/11/22 TPW 9/12 3400 8/29/22 |
|
|
|
|
|
#978 |
![]() Drives: Camaro 2SS Join Date: Aug 2022
Location: Seattle
Posts: 7
|
Just ordered my '23 2SS in Rapid Blue with the Shock and Steel package. And now the wait.....
|
|
|
|
|
|
#979 |
|
Banned
Drives: i want a camaro Join Date: Aug 2019
Location: miami, the hottest place on earth
Posts: 407
|
i think this is the design of the 20 in. wheels that i was looking for, if it is I'm running with it
|
|
|
|
|
|
#980 |
![]() Drives: 1998 Trans Am / 2018 Camaro SS Join Date: May 2009
Location: West Chester PA
Posts: 102
|
Just curious, I ordered my car the first day orders were available. Unfortunately there were five people in front of me that were carryovers from the 22 they got bumped to 23, and had to be built first. I am now next in line for my allocation which could be excepted anytime this month now that production has ramped up or the beginning of September. My question was on average how long did your cars take to get built, with no holdups in parts issues after allocation and acceptance was made by GM?
|
|
|
|
|
|
|
|
|
Post Reply
|
| Tags |
| 2ss 1le m6 shadow grey metallic |
|
|