#43 |
|
Craig
Drives: 2019 ZL1 1LE Join Date: Jan 2019
Location: Peterborough, ON Canada
Posts: 443
|
This was my reply I got
|
|
|
|
|
|
#44 |
![]() Drives: 19 zl1 Join Date: Dec 2015
Location: Ontario
Posts: 143
|
Not starting to build until april 1...... I think im going to puke lol
Heres a list of codes i found. Not sure if they are correct but something. 1100, Preliminary order accepted 2000, Order accepted by GM 2030, Order re-edited (if necessary) 2051, Order changed thru Web 2500, Order preferenced 3000, Order accepted by production control 3100, Order available to sequence 3300, Order scheduled for production 3400, Order broadcast 3800, Order produced 4000, Available to ship 4104, Bailment Invoice 4200, Shipped 4300, Intermediate Delivery 4B00, Bayed 5000, Delivered to the dealer 6000, Delivered to the customer 9000, Order Cancelled |
|
|
|
|
|
#45 |
![]() ![]() ![]() ![]() Drives: 19 Z06 Join Date: Nov 2011
Location: Oakville Ont.
Posts: 1,427
|
Congrats on your purchase. I'm thinking of getting one. I'm just not sure. The rarity of the ZL1's for us Canadians makes them special. I did see one last summer and I liked it. Debating between a Z06 and ZL1. Maybe I'll just keep what I have haha. These cars are all so good its getting hard to choose which one.
__________________
Gone but not forgotten:
1974 Corvette Stingray 454 1986 Z28 2009 Mustang GT convertible 2012 45th 2SS Vert 2013 ZL1 M6 2014 Zl1 M6 2014 GT500 2016 Challenger Hellcat M6 www.youtube.com/c/garageking |
|
|
|
|
|
#46 |
![]() Drives: 2019 ZL1 (Ordered) Join Date: Jan 2019
Location: Canada
Posts: 58
|
I received a message from my salesman last Wed saying that my ZL1 order had been picked up by the factory, couldn't provide a the schedule, but the build date might be early march..
__________________
2019 ZL1 Mosaic BLK 10spd
2014 GMC Sierra All Terrain 6.2L 2004 SVT Cobra - Port Blower - Pullied - Exhaust - Sold 2000 Camaro SS - 418ci LS - Brian Tooley H/C/I |
|
|
|
|
|
#47 |
|
Craig
Drives: 2019 ZL1 1LE Join Date: Jan 2019
Location: Peterborough, ON Canada
Posts: 443
|
|
|
|
|
|
|
#48 |
![]() ![]() ![]() ![]() Drives: 2018 ZL1 A10 Join Date: May 2012
Location: British Columbia, Canada
Posts: 1,374
|
I attached a spreadsheet I used to track our 2018 orders, just to give you an idea when they were ordered, built and delivered. Don't get discouraged....it is a process and patience is key. Congrats on your car. They are wicked !!
__________________
DAVENPORT STAGE 2 PLUS - 2" ARH ceramic coated headers - 3" ARH catless exhaust - Stock NPP mufflers - Kong ported SC - Katech 103 ported TB - Rotofab 5" Big gulp CAI - 22.5% lower pulley - ATI Harmonic balancer - Cordes SC expansion tank - MSD hi temp ignition wires - Koolsox spark plug insulators - custom tunes - 660hp/725tq pump - 713hp/763tq race
|
|
|
|
|
|
#49 |
|
Craig
Drives: 2019 ZL1 1LE Join Date: Jan 2019
Location: Peterborough, ON Canada
Posts: 443
|
Oct 2017 order was Aug 2018 delivery??? I really hope that’s not the case for 2019 since I ordered in Jan 2019...
|
|
|
|
|
|
#50 |
![]() Drives: 2019 ZL1 A10 Black Join Date: Jan 2019
Location: AB
Posts: 93
|
There is some seriously scary stuff in there.
Earliest TPW was march but we have no idea when that car was ordered. There are orders in there that had May TPW's and didn't get delivered until July or august. If thats the case I might be cancelling my order. |
|
|
|
|
|
#51 |
![]() Drives: 2019 ZL1 (Ordered) Join Date: Jan 2019
Location: Canada
Posts: 58
|
Late Oct.
I received another text message from my salesman today stating my Z is set for production March 18th. He also sent the follow and In the words of the salesman; "apparently your is the only accepted order for a coupe making it the first production coupe for Canada, and you can expect delivery early to mid June" I'm not really reading into that to much.
__________________
2019 ZL1 Mosaic BLK 10spd
2014 GMC Sierra All Terrain 6.2L 2004 SVT Cobra - Port Blower - Pullied - Exhaust - Sold 2000 Camaro SS - 418ci LS - Brian Tooley H/C/I |
|
|
|
|
|
#52 | |
|
Craig
Drives: 2019 ZL1 1LE Join Date: Jan 2019
Location: Peterborough, ON Canada
Posts: 443
|
Quote:
|
|
|
|
|
|
|
#53 | |
![]() Drives: 19 zl1 Join Date: Dec 2015
Location: Ontario
Posts: 143
|
Quote:
Also im accepted by production control. Ordered in september. But i have no build date yet. We'll all know more in a month. |
|
|
|
|
|
|
#54 |
![]() Drives: 19 zl1 Join Date: Dec 2015
Location: Ontario
Posts: 143
|
Newfie....
Is that accepted by GM or accepted by production control? Just wondering. There is a long chain of codes to wind through |
|
|
|
|
|
#55 |
![]() Drives: 19 zl1 Join Date: Dec 2015
Location: Ontario
Posts: 143
|
I cant follow that spreadsheet.
Some orders are a year from order to delivery and others 3 months. I cant get a good idea from it anyway personally |
|
|
|
|
|
#56 |
![]() Drives: 19 zl1 Join Date: Dec 2015
Location: Ontario
Posts: 143
|
And there already have been at least 2 zl1s delivered to canada late in december at some point.
Im thinking they were early production to get advertising out for gm. While the rest of us that have put down deposits and like myself traded in my zl back in september sit and wait.....until late spring....june.. Surely not. The purpose of them not shipping until spring was solely because of tires i was told over and over. Almost makes one not want to buy a gm. But im kinda stuck because i aint a gt350 or hellcat fan |
|
|
|
|
|
|
|
|