Parts During Lansing Grand River Downtime

Good Afternoon Everyone,

I am in the same boat as many of you with a target production week that is during the downtime at LGR. I am wondering if anyone can shed some light on what happens to our parts(engines, brakes, bodies, transmissions, infotainment systems, etc..) while the plant is shut down. I assume that the shipping doesn’t stop so are all of our parts sitting there waiting until the plant is back up and running?

Any insight anyone can provide will be appreciated, all of us will be built soon enough!
TCCamaro is offline   Reply With Quote
Old 09-28-2021, 08:03 PM   #2
tommcd24
 
tommcd24's Avatar
 
Drives: 2SS M6 NPP Convertible
Join Date: Mar 2021
Location: MN
Posts: 330
Pure speculation, but my assumption is the downtime is due to waiting on parts - likely semiconductors/microchips of one sort or another. Or other assemblies that were in turn waiting on chips.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes

Dec. 18: took her home
Dec. 9: arrival at dealer
Nov. 16-29: Toledo, OH (railyard)
Nov. 9: 3800 -> 4300 (for stripes)
Oct. 8: 3400 status TPW 10/25
Oct. 6: 3100 status TPW 10/25
Sept. 9: 3000 status TPW 10/4/2021
Sept. 3: 2000 status (after 5 1/2 months)
Sept. 2: Change Order: 2SS (V6 constraint)
April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6)
tommcd24 is offline   Reply With Quote
Old 09-28-2021, 08:12 PM   #3
BundiMan
The Nights Watch
 
BundiMan's Avatar
 
Drives: 22 ZL1 M6 Vert
Join Date: Jun 2016
Location: Lansing, MI
Posts: 386
Chevy uses a just-in-time system so when the Plant is down all of the suppliers stop shipping as well. They may run a little to get ahead. They are down because they are missing the chips.
__________________
Ordered 22 ZL1 Vert M6 Wild Cherry
2000 19 Jul 2021
3000 21 Jul 2021
TPW 8/23 24 Jul 2021
3400 30 Jul 2021
3800 26 Aug 2021
4000 1 Sep 2021
6000 14 Sep 2021
57 Days from accepted order to delivery.
19 Days from build to delivery.
BundiMan is offline   Reply With Quote
Old 09-28-2021, 08:54 PM   #4
TCCamaro
 
Drives: 2016 Camaro 1LT RS V6
Join Date: May 2020
Location: Michigan
Posts: 94
Quote:
Originally Posted by BundiMan View Post
Chevy uses a just-in-time system so when the Plant is down all of the suppliers stop shipping as well. They may run a little to get ahead. They are down because they are missing the chips.
Great thank you for the information Bundi! This is exactly what I was looking for, so the parts don’t get there until the car is pretty much starting to be assembled then correct?
TCCamaro is offline   Reply With Quote
 
Post Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:54 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.