Lansing plant shutting down for a week

The Lansing Grand River plant will be closed next week due to parts shortage. This will effect all cars made there.
__________________
Ordered 22 ZL1 Vert M6 Wild Cherry
2000 19 Jul 2021
3000 21 Jul 2021
TPW 8/23 24 Jul 2021
3400 30 Jul 2021
3800 26 Aug 2021
4000 1 Sep 2021
6000 14 Sep 2021
57 Days from accepted order to delivery.
19 Days from build to delivery.
BundiMan is offline   Reply With Quote
Old 04-01-2022, 08:27 AM   #2
SSlow6
 
SSlow6's Avatar
 
Drives: '11 BMW 328i, '22 2SS 1LE
Join Date: Aug 2021
Location: NW Chicago Burbs
Posts: 83
Any idea if they will still be shipping cars? Mines been built and getting the 1LE hood wrap, but I suspect it could be ready to ship next week.
__________________
2022 2SS 1LE M6 Wild Cherry

01/22/2022 - 1100
04/16/2022 - 6000
SSlow6 is offline   Reply With Quote
Old 04-01-2022, 08:50 AM   #3
RegularJohn86278263789
 
Drives: 2008 Corvette Z06, 1991 Mustang 5.0
Join Date: Feb 2022
Location: Florida
Posts: 70
Where did you get this info?

I’m reading that the Lansing Plant will remain open along with some others, but the rest will close down for one or two weeks.

RegularJohn86278263789 is offline   Reply With Quote
Old 04-01-2022, 09:47 AM   #4
MrChevyDC3
 
MrChevyDC3's Avatar
 
Drives: 2022 Vert 2SS
Join Date: Mar 2021
Location: MI
Posts: 70
+1 have a car there already built, awaiting shipment to dealership. Are they still shipping?
__________________
2022 1SS 'Vert on order
OCT 15, 2021 > 1100 (Paid $500 @Dealership)
Feb 25, 2022 > 1100
MAR 1, 2022 > Found 2SS Vert in Transit, out of state, put down deposit
Mar 15, 2022 > Went to original dealer to retrieve $500 Deposit, original order now at 3000
MrChevyDC3 is offline   Reply With Quote
Old 04-01-2022, 09:53 AM   #5
armycop71
Love my Satin Steel LT-1!
 
armycop71's Avatar
 
Drives: 6-Speed LT-1...
Join Date: Aug 2016
Location: Kentucky
Posts: 497
Lansing is listed as one of the few plants that is staying open....
__________________
2022 SATIN STEEL LT1

6-Speed Man|Carbon Flash Wheels
Technology Pkg|NPP|Satin Blk Pkg
ZL1 Rock Guards|Red Knee Pad Set
PBC LT1 engine built by Debi Lewis
armycop71 is offline   Reply With Quote
Old 04-01-2022, 09:54 AM   #6
mRahmani
 
Drives: ‘23 SS 1LE
Join Date: Nov 2021
Location: SE MI
Posts: 111
https://www.wlns.com/news/local-news...part-shortage/

Local news is reporting a 1 week shutdown with production resuming 4/11.
__________________
2023 2SS 1LE “Red Hot”
Built 7/14/22
Delivered 8/27/22!
mRahmani is offline   Reply With Quote
Old 04-01-2022, 10:42 AM   #7
FDNY-L107
 
FDNY-L107's Avatar
 
Drives: 2020 COPO #006
Join Date: Feb 2011
Location: Cecil County, Maryland
Posts: 134
Folks, below link will take you to the current GM plant operating status. Lansing is "idle".

https://gmauthority.com/blog/gm/gm-f...uction-status/
__________________
2020 COPO #006, John Force Edition 5.7 SC
Gone, but not forgotten:
*2019 ZL1 755WHP/782RWTQ
*2011 LS V6 375HP, 6 speed
*1994 Camaro V6, 5 speed
*1985 IROC Z 5.0TPI (special factory ordered 1st new car)
*1979 Z-28 4-speed 350
*1975 Camaro 350 Auto (first car owned)
RESERVED:
*2023 Hummer EV 3X Pickup
*2024 Hummer EV 3X SUV
FDNY-L107 is offline   Reply With Quote
Old 04-01-2022, 12:04 PM   #8
Odabo
 
Odabo's Avatar
 
Drives: Chevrolet Blazer
Join Date: Oct 2021
Location: Space Coast
Posts: 242
Last week my dealer said my order would go into the system in April. I guess that's not gonna happen now!
__________________
2023 2SS 1LE Radiant Red, A10, PDR, Black Lugs, ACS Rock Guards, ACS ZL1 1LE Side Skirts
Odabo is offline   Reply With Quote
Old 04-01-2022, 01:08 PM   #9
LesserO2Evils
GM repeat offender...
 
Drives: 16 2SS
Join Date: Dec 2014
Location: Grandview, Texas
Posts: 1,474
My production week is supposed to be 4/11. I wonder if that will stay on target? Does this “idle time” delay production for following weeks, or is the idle time already accounted for?
__________________
'16 2SS, Summit White. A8. MRC. NPP.
Ordered:09/03/15. Received 12/22/15

INCOMING: ‘22 ZL1, Satin Steel. A10. PDR.
Ordered: 03/02/22.
LesserO2Evils is offline   Reply With Quote
Old 04-01-2022, 01:20 PM   #10
armycop71
Love my Satin Steel LT-1!
 
armycop71's Avatar
 
Drives: 6-Speed LT-1...
Join Date: Aug 2016
Location: Kentucky
Posts: 497
Bad April fool's joke maybe?
__________________
2022 SATIN STEEL LT1

6-Speed Man|Carbon Flash Wheels
Technology Pkg|NPP|Satin Blk Pkg
ZL1 Rock Guards|Red Knee Pad Set
PBC LT1 engine built by Debi Lewis
armycop71 is offline   Reply With Quote
Old 04-01-2022, 01:24 PM   #11
Odabo
 
Odabo's Avatar
 
Drives: Chevrolet Blazer
Join Date: Oct 2021
Location: Space Coast
Posts: 242
Quote:
Originally Posted by armycop71 View Post
Bad April fool's joke maybe?
I hope that's all it is. But if it is, it's a very bad joke.
__________________
2023 2SS 1LE Radiant Red, A10, PDR, Black Lugs, ACS Rock Guards, ACS ZL1 1LE Side Skirts
Odabo is offline   Reply With Quote
Old 04-01-2022, 03:45 PM   #12
tommcd24
 
tommcd24's Avatar
 
Drives: 2SS M6 NPP Convertible
Join Date: Mar 2021
Location: MN
Posts: 330
Quote:
Originally Posted by LesserO2Evils View Post
My production week is supposed to be 4/11. I wonder if that will stay on target? Does this “idle time” delay production for following weeks, or is the idle time already accounted for?
Production downtime will delay your production week. If you are at 3000 or 3100, your TPW will be updated. If you are already at 3400, your TPW will not be updated, but your build will remain in "sequence" and built in the same order it would have if there was no downtime.

My build was affected by 3-weeks of downtime in October and my TPW changed from 10/4/21 to 10/25/21 and was finally actually built on Nov. 9th.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes

Dec. 18: took her home
Dec. 9: arrival at dealer
Nov. 16-29: Toledo, OH (railyard)
Nov. 9: 3800 -> 4300 (for stripes)
Oct. 8: 3400 status TPW 10/25
Oct. 6: 3100 status TPW 10/25
Sept. 9: 3000 status TPW 10/4/2021
Sept. 3: 2000 status (after 5 1/2 months)
Sept. 2: Change Order: 2SS (V6 constraint)
April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6)
tommcd24 is offline   Reply With Quote
Old 04-01-2022, 04:58 PM   #13
1fastz28
 
Drives: 2022 2SS 1LE
Join Date: Dec 2021
Location: St. Louis
Posts: 118
My car was due to be built next week, the wait continues apparently.
1fastz28 is offline   Reply With Quote
Old 04-01-2022, 05:09 PM   #14
LesserO2Evils
GM repeat offender...
 
Drives: 16 2SS
Join Date: Dec 2014
Location: Grandview, Texas
Posts: 1,474
Quote:
Originally Posted by tommcd24 View Post
Production downtime will delay your production week. If you are at 3000 or 3100, your TPW will be updated. If you are already at 3400, your TPW will not be updated, but your build will remain in "sequence" and built in the same order it would have if there was no downtime.

My build was affected by 3-weeks of downtime in October and my TPW changed from 10/4/21 to 10/25/21 and was finally actually built on Nov. 9th.
Im@3400. Thanks bud.
__________________
'16 2SS, Summit White. A8. MRC. NPP.
Ordered:09/03/15. Received 12/22/15

INCOMING: ‘22 ZL1, Satin Steel. A10. PDR.
Ordered: 03/02/22.
LesserO2Evils is offline   Reply With Quote
 
Post Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:32 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.