02-25-2022, 11:46 AM | #1 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
Sitting at 3800
I tried to search but couldn't find a good thread on this. How long is typical (at least in these times) for a Camaro to sit at 3800? Mine has been there for a month. It needs stripes as well so needs to go to bayed next I believe.
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
02-25-2022, 12:31 PM | #2 |
Drives: 2022 Wild Cherry ZL1 1LE Join Date: Mar 2021
Location: Fremont, CA
Posts: 447
|
Just one data point, but mine sat at 3800 for 16 days.
Geoff |
02-25-2022, 01:43 PM | #3 |
Drives: 68, 69 Firebirds, 14 & 22 Camaros Join Date: Sep 2021
Location: WA
Posts: 176
|
I found one in transit after waiting from 8/23/21 to 2/5/22 without getting an allocation. I got it at 4300 but I can tell you that mine was at 4300 (intermediate delivery) when i secured it. Then to 4B00 (bayed) after it was shipped to Toledo, OH on 2/1/22. It has been bayed since. I was told by Joe that waiting for the train could be the hardest part. I'm in WA State so hopefully you are closer.
__________________
2022 Camaro, Rapid Blue, 2SS, 1LE VIN: 1G1FH1R75N0109563 Put deposit on in transit car 2/5/22 after waiting 6 months with no allocation. Original order placed 8/23/21.
4B00-1/28/22; 4200-Shipped! 3/5/22; On it's Way! In North Platte, NE 3/11/22; Train is rolling through Wyoming 3/14/22; Arrived at final train stop in Kent, WA 3/22/22; Arrived at dealer 3/24/22; Pick up 3/26/22!!! Finally...the agonizing wait is over... |
02-25-2022, 02:01 PM | #4 |
That seems unusual. Mine moved from 3800-4300 the day it was built. If yours is not at least bayed (4B00) it could be that it is waiting for a chip or some last modules to be dropped in before leaving LGR. Unfortunately there is no way to check on what the hold up might be. Hopefully it starts moving again soon for you.
Striping does require some intermediate movement, so depending on how often you check you can see multiple 4B00/4200/4300 codes between LGR and delivery railyard.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
|
03-03-2022, 07:54 PM | #5 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
Asked Joe and still in 3800 status, now five weeks
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
03-03-2022, 09:05 PM | #6 |
15 days for mine. Left Lansing yesterday, arrived at dealer this morning!
|
|
03-04-2022, 08:22 AM | #7 |
Love my Satin Steel LT-1!
Drives: 6-Speed LT-1... Join Date: Aug 2016
Location: Kentucky
Posts: 497
|
I didn't have anything added to the exterior, so mine was only at 3800 for a week before it got to my dealer.
__________________
2022 SATIN STEEL LT1
6-Speed Man|Carbon Flash Wheels Technology Pkg|NPP|Satin Blk Pkg ZL1 Rock Guards|Red Knee Pad Set PBC LT1 engine built by Debi Lewis |
03-04-2022, 03:53 PM | #8 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
I was debating the stripes... regretting it now
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
|
|
Post Reply
|
Tags |
3800 bayed stripes |
|
|