Old 02-25-2022, 11:46 AM   #1
ByteSaidFred
 
Drives: Porsche Boxster S 6MT (987.2)
Join Date: Oct 2021
Location: CA
Posts: 28
Question Sitting at 3800

I tried to search but couldn't find a good thread on this. How long is typical (at least in these times) for a Camaro to sit at 3800? Mine has been there for a month. It needs stripes as well so needs to go to bayed next I believe.
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com)
1/20/2022 - 3400 Status TPW 1/24
1/27/2022 - 3800 Vehicle Produced
3/23/2022 - 4300 Interim movement
ByteSaidFred is offline   Reply With Quote
Old 02-25-2022, 12:31 PM   #2
Jofu
 
Drives: 2022 Wild Cherry ZL1 1LE
Join Date: Mar 2021
Location: Fremont, CA
Posts: 447
Just one data point, but mine sat at 3800 for 16 days.

Geoff
Jofu is offline   Reply With Quote
Old 02-25-2022, 01:43 PM   #3
MuscleCarMike
 
Drives: 68, 69 Firebirds, 14 & 22 Camaros
Join Date: Sep 2021
Location: WA
Posts: 176
Quote:
Originally Posted by ByteSaidFred View Post
I tried to search but couldn't find a good thread on this. How long is typical (at least in these times) for a Camaro to sit at 3800? Mine has been there for a month. It needs stripes as well so needs to go to bayed next I believe.
I found one in transit after waiting from 8/23/21 to 2/5/22 without getting an allocation. I got it at 4300 but I can tell you that mine was at 4300 (intermediate delivery) when i secured it. Then to 4B00 (bayed) after it was shipped to Toledo, OH on 2/1/22. It has been bayed since. I was told by Joe that waiting for the train could be the hardest part. I'm in WA State so hopefully you are closer.
__________________
2022 Camaro, Rapid Blue, 2SS, 1LE VIN: 1G1FH1R75N0109563 Put deposit on in transit car 2/5/22 after waiting 6 months with no allocation. Original order placed 8/23/21.

4B00-1/28/22; 4200-Shipped! 3/5/22; On it's Way! In North Platte, NE 3/11/22; Train is rolling through Wyoming 3/14/22; Arrived at final train stop in Kent, WA 3/22/22; Arrived at dealer 3/24/22; Pick up 3/26/22!!! Finally...the agonizing wait is over...
MuscleCarMike is offline   Reply With Quote
Old 02-25-2022, 02:01 PM   #4
tommcd24
 
tommcd24's Avatar
 
Drives: 2SS M6 NPP Convertible
Join Date: Mar 2021
Location: MN
Posts: 330
That seems unusual. Mine moved from 3800-4300 the day it was built. If yours is not at least bayed (4B00) it could be that it is waiting for a chip or some last modules to be dropped in before leaving LGR. Unfortunately there is no way to check on what the hold up might be. Hopefully it starts moving again soon for you.

Striping does require some intermediate movement, so depending on how often you check you can see multiple 4B00/4200/4300 codes between LGR and delivery railyard.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes

Dec. 18: took her home
Dec. 9: arrival at dealer
Nov. 16-29: Toledo, OH (railyard)
Nov. 9: 3800 -> 4300 (for stripes)
Oct. 8: 3400 status TPW 10/25
Oct. 6: 3100 status TPW 10/25
Sept. 9: 3000 status TPW 10/4/2021
Sept. 3: 2000 status (after 5 1/2 months)
Sept. 2: Change Order: 2SS (V6 constraint)
April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6)
tommcd24 is offline   Reply With Quote
Old 03-03-2022, 07:54 PM   #5
ByteSaidFred
 
Drives: Porsche Boxster S 6MT (987.2)
Join Date: Oct 2021
Location: CA
Posts: 28
Asked Joe and still in 3800 status, now five weeks
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com)
1/20/2022 - 3400 Status TPW 1/24
1/27/2022 - 3800 Vehicle Produced
3/23/2022 - 4300 Interim movement
ByteSaidFred is offline   Reply With Quote
Old 03-03-2022, 09:05 PM   #6
curtisd
 
curtisd's Avatar
 
Drives: 22 Wild Cherry 2SS.
Join Date: Feb 2018
Location: KY
Posts: 78
15 days for mine. Left Lansing yesterday, arrived at dealer this morning!
Attached Images
 
curtisd is offline   Reply With Quote
Old 03-04-2022, 08:22 AM   #7
armycop71
Love my Satin Steel LT-1!
 
armycop71's Avatar
 
Drives: 6-Speed LT-1...
Join Date: Aug 2016
Location: Kentucky
Posts: 497
I didn't have anything added to the exterior, so mine was only at 3800 for a week before it got to my dealer.
__________________
2022 SATIN STEEL LT1

6-Speed Man|Carbon Flash Wheels
Technology Pkg|NPP|Satin Blk Pkg
ZL1 Rock Guards|Red Knee Pad Set
PBC LT1 engine built by Debi Lewis
armycop71 is offline   Reply With Quote
Old 03-04-2022, 03:53 PM   #8
ByteSaidFred
 
Drives: Porsche Boxster S 6MT (987.2)
Join Date: Oct 2021
Location: CA
Posts: 28
Quote:
Originally Posted by armycop71 View Post
I didn't have anything added to the exterior, so mine was only at 3800 for a week before it got to my dealer.
I was debating the stripes... regretting it now
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com)
1/20/2022 - 3400 Status TPW 1/24
1/27/2022 - 3800 Vehicle Produced
3/23/2022 - 4300 Interim movement
ByteSaidFred is offline   Reply With Quote
 
Post Reply

Tags
3800 bayed stripes


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:49 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.