03-04-2022, 09:19 AM | #43 | |
Quote:
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
||
03-04-2022, 11:08 PM | #44 |
Drives: 2022 Camaro 2SS Join Date: Feb 2022
Location: Wisconsin
Posts: 2
|
Thanks for the insight. I haven’t seen the constraint thread but after looking at it, that’s just straight up depressing. Like many have said, a ‘23 looks like a real possibility. I think those start production in June.
|
03-05-2022, 02:20 PM | #45 |
Drives: Radiant Red SS 1LE & ZL1 Join Date: Dec 2020
Location: Boca Raton Fla
Posts: 123
|
September 7th. No hurry and accepting it as 2023. When I sold my 2020 SS1LE I had no idea how long it would be!
|
03-05-2022, 06:30 PM | #46 |
Love my Satin Steel LT-1!
Drives: 6-Speed LT-1... Join Date: Aug 2016
Location: Kentucky
Posts: 497
|
My original order I placed at my hometown dealer is still sitting at 1100 since 11/16/21. They probably won't cancel it and let it ride until the end of the model year.
__________________
2022 SATIN STEEL LT1
6-Speed Man|Carbon Flash Wheels Technology Pkg|NPP|Satin Blk Pkg ZL1 Rock Guards|Red Knee Pad Set PBC LT1 engine built by Debi Lewis |
03-07-2022, 11:51 AM | #47 |
Drives: 22 ZL1 1LE A10 Join Date: Feb 2022
Location: Ohio
Posts: 233
|
found one coming in to a dealer that wasn't spoken for so i snatched it up. they ordered it 90 days ago. they said its built and sitting out back waiting on chips at GM.
|
|
|
Post Reply
|
|
|