12 - 16 week wait for ZL1?
Looking to order a 2022 ZL1. Dealer saying 12 to 16 weeks. Sound like truth or BS? Thanks in advance
|
11-09-2021, 06:03 PM | #2 |
Drives: Rapid Blue 2022 Camaro 1SS Join Date: Sep 2021
Location: Waterloo, Iowa
Posts: 204
|
This is the first time I am hearing of that long of a wait, but the ZL1 is one of the trims that has a constraint on it currently, with a TBD as an end date.
__________________
9/9/2021 - 1100 (date of deposit)
10/15/2021 - 2000 11/4/2021 - 3100 Status TPW 11/15 11/9/2021 - 3400 Status TPW 11/15 11/24/2021 - 3800 Status built 11/21/2021 12/2/2021 - 5000 Status 12/13/2021 - 6000 Status |
11-09-2021, 07:12 PM | #3 |
Drives: 2022 CT4-V Blackwing Join Date: Sep 2013
Location: Florida
Posts: 2,723
|
12-16 weeks may be the build time but could be much longer if the dealer doesn't have an allocation for a ZL1 available. I was quoted a 6-9 months because there were 3 folks ahead of me waiting for an allocation. Dealers may only get one per month if lucky.
I was impatient so I found a 2021 ZL1 close to my spec in inventory. They only seem to last a few days in my area if they are not pre-sold.
__________________
2002 Corvette Z06 - Black - Sold
2013 Camaro SS 1LE - Black - M6 - Sold 2016 Camaro SS - Mosaic Black - A8 - Sold 2017 C7 Stingray - M7 Coupe - Sold 2019 C7 Grand Sport M7 Vert - Sold 2021 Camaro ZL1 - Black - A10 - Sold 2019 Tesla Model 3 2022 CT4-V Blackwing - M6 |
11-09-2021, 07:32 PM | #4 |
Drives: CHEVROLET CORVETTE Join Date: Feb 2021
Location: SWFL
Posts: 513
|
Ordered a 2SS 1LE in 2/2021. Arrived August 31st. 12-14 weeks is a gift.
|
11-09-2021, 08:12 PM | #5 |
My dealer told me 5 months for a 1ss. Anything on constraint they said was TBD.
Almost the same... |
|
11-09-2021, 08:41 PM | #6 |
Drives: 2021 Camaro ZL1 A10 Join Date: Nov 2018
Location: Idaho
Posts: 1,206
|
Sounds reasonable. My ZL1 took 3 months from order to delivery in Idaho (and my dealer already had an allocation ready). But this was earlier this year in the winter before everything went completely bonkers.
__________________
2021 Camaro ZL1 A10
2022 GR Supra 3.0 Past: 2018 Mustang GT Premium w/ PP1, MR, and A10 2007 MazdaSpeed3 1995 Pontiac Trans Am 1987 Camaro Z28 Last edited by Idaho2018GTPremium; 11-10-2021 at 10:13 AM. |
11-10-2021, 07:33 AM | #7 |
Drives: 23 ZL1 A10 Rapid Blue Join Date: Aug 2020
Location: MO
Posts: 1,986
|
Im closing in on 3 months without a dealer allocation and I really have no expectation that I'll see it before late Feb or in to Mar which was when I wanted to take delivery any way.
|
11-10-2021, 07:57 AM | #8 |
The Nights Watch
|
in normal times 12-16 weeks is the normal timeframe when ordering a vehicle from GM.
__________________
Ordered 22 ZL1 Vert M6 Wild Cherry
2000 19 Jul 2021 3000 21 Jul 2021 TPW 8/23 24 Jul 2021 3400 30 Jul 2021 3800 26 Aug 2021 4000 1 Sep 2021 6000 14 Sep 2021 57 Days from accepted order to delivery. 19 Days from build to delivery. |
11-10-2021, 09:33 AM | #9 |
Drives: 2022 SS 1LE Join Date: Dec 2020
Location: Metro Detroit
Posts: 222
|
Mine took about 25 weeks order to delivery. So between chip delays and constraints.. yeah 12-16 is totally reasonable.
__________________
Alpha Platform Aficionado
2022 Camaro SS 1LE | Rapid Blue | Manual Cadillac ATS 3.6 RWD | Daily Driver Previous: Challenger Scat Pack Widebody |
11-10-2021, 09:57 AM | #10 |
Drives: 2000 Pewter WS6, 2022 RBM ZL1 Join Date: Sep 2020
Location: IL - NW Burbs
Posts: 94
|
This is tough to say as so many of us that were waiting on cars (or that still are) put in orders before production for 22s was even started so you almost have to reduce that time when it wasn't even possible for a car to get built. Once it actually started mine took about 9-10 weeks (that included two weeks of additional plant downtime after they started production). No constraints impacting getting an allocation so that helped as well. Given there are some constraints on ZL1s now that timeframe sounds fair, especially with the holidays coming up.
__________________
Ordered 2022 Riverside Blue A10 ZL1 - 7/26/21
1100 (7/26/21) --> 3800 (10/8/21) --> 6000 (10/30/21) |
11-10-2021, 12:06 PM | #11 |
BLUPRINT_1LE
Drives: 2022 Rapid Blue SS 1LE Join Date: May 2017
Location: Motor City -> AZ
Posts: 726
|
I will be waiting for 4 months this weekend based on when i placed my order. Still waiting for allocation. Hopefully it gets accepted soon. So far no constraints on it. I would lose my mind if I had other trims right now because allocations and constraints during these times don’t mix well.
__________________
2022 Camaro SS 1LE | PDR | Rapid Blue | Manual | Katech Built SS 1LE | Katech Build Sheet
IG: BLUPRINT_1LE YT: BLUPRINT_1LE ---------------------------------------------------------------- |
11-10-2021, 12:22 PM | #12 | |
Drives: 2022 ZL1 ILE Wild Cherry Tint Coat Join Date: Oct 2021
Location: Detroit
Posts: 16
|
Quote:
It will be worth the wait, just ranting, my family is tired of hearing about it. |
|
11-10-2021, 01:43 PM | #13 | |
BLUPRINT_1LE
Drives: 2022 Rapid Blue SS 1LE Join Date: May 2017
Location: Motor City -> AZ
Posts: 726
|
Quote:
__________________
2022 Camaro SS 1LE | PDR | Rapid Blue | Manual | Katech Built SS 1LE | Katech Build Sheet
IG: BLUPRINT_1LE YT: BLUPRINT_1LE ---------------------------------------------------------------- |
|
11-10-2021, 07:44 PM | #14 |
12-16 weeks seems pretty reasonable at present, particularly given current constraints.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
|
|
|