01-11-2022, 05:29 PM | #1 |
Drives: n/a Join Date: Jul 2018
Location: Mia
Posts: 64
|
30 days out from delivery
I know this is a hard question with COVID and the way GM works, but anyone have an rough idea of when (status code) custom build cars more or less 30 days out from delivery [to Florida]?
I want to sell my current car and I'd like some buffer space before my order gets delivered. Thanks! |
01-11-2022, 06:15 PM | #2 | |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Quote:
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
|
01-11-2022, 06:37 PM | #3 |
Drives: Chevy ss sedan, 22 ZL1 vert Join Date: Jul 2021
Location: Upstate NY
Posts: 88
|
Mine was built week of 10/18 as per the build sheet with rpo codes and was at the dealer in Ohio 11/4 when I first called about it, picked up 11/8 so 2 weeks
|
01-11-2022, 06:38 PM | #4 |
Drives: n/a Join Date: Jul 2018
Location: Mia
Posts: 64
|
great, thanks!
|
01-21-2022, 10:56 AM | #5 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
How does a California delivery compare with a Midwest delivery? Extra week or worse? I'm super excited now that I have a TPW of 1/24!
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
01-21-2022, 11:16 AM | #6 | |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Quote:
He is in Miami. It's coming via rail.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
|
01-21-2022, 11:17 AM | #7 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
You wont see it until likely mid March at best. Maybe end of March.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
01-21-2022, 03:23 PM | #8 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
Ah that's disappointing, but thanks for the info! Guess my dealer was correct back in October to expect 6 months. I can't complain though since this is a swap on a Bolt EV recall 😁
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
01-21-2022, 04:12 PM | #9 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Of course. Yeah, the odds of getting it in early March actually exist for you only because you didn't get a 1LE - did you order stripes at all? Anything involving vinyl wrap or stripes adds on a solid week or so of time.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
01-21-2022, 04:26 PM | #10 | |
Drives: Previous '04 SSR; '10 2SS; '16 2SS Join Date: Mar 2009
Location: Western NY
Posts: 191
|
Quote:
If offset, how many extra miles do they put on your new car ??
__________________
2022 LT1, Vivid Orange Metallic.
Order placed 1/25/22 Took delivery 5/28/22 |
|
01-21-2022, 04:28 PM | #11 | |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Quote:
How many extra miles? Probably a negligible amount...if any.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
|
01-21-2022, 05:35 PM | #12 |
Drives: Porsche Boxster S 6MT (987.2) Join Date: Oct 2021
Location: CA
Posts: 28
|
Yeah, have stripes
__________________
10/7/2021 - 2022 LT1 6MT ordered
12/27/2021 - Order accepted by GM (chevrolet.com) 1/20/2022 - 3400 Status TPW 1/24 1/27/2022 - 3800 Vehicle Produced 3/23/2022 - 4300 Interim movement |
01-21-2022, 06:12 PM | #13 |
Drives: 2018 Camaro 2SS A8 Join Date: Jul 2017
Location: East Tennessee
Posts: 11,597
|
New cars are typically delivered with 3 to 7 miles on the odometer. My first 6th gen Camaro had 4 miles, this one that I drive now had 6.
__________________
2018 Camaro 2SS — G7E MX0 NPP F55 IO6
735 rwhp | 665 rwtq Magnuson TVS 2300 80mm pulley | Kooks 1 7/8" LT headers | JRE smooth idle terminator cam | LT4 FS & injectors | TSP forged pistons & rods JMS PowerMAX | DSX flex fuel kit | Roto-Fab CAI | Soler 95mm LT5 TB | 1LE wheels | 1LE brakes | BMR rear cradle lockout | JRE custom tune 1100 - 1/30/18 | 2000 - 1/31/18 3000 - 2/06/18 TPW 2/26/18 3400 - 2/19/18 | 3800 - 2/26/18 4300 - 2/27/18 | 4B00 - 3/01/18 4200 - 3/05/18 | 4800 - 3/14/18 5000 - 3/16/18 | 6000 - 3/19/18 |
01-21-2022, 11:42 PM | #14 |
The Nights Watch
|
From September to October, it seemed like the biggest delay was the shipping of vehicles by train and truck
__________________
Ordered 22 ZL1 Vert M6 Wild Cherry
2000 19 Jul 2021 3000 21 Jul 2021 TPW 8/23 24 Jul 2021 3400 30 Jul 2021 3800 26 Aug 2021 4000 1 Sep 2021 6000 14 Sep 2021 57 Days from accepted order to delivery. 19 Days from build to delivery. |
|
|
Post Reply
|
|
|