05-19-2022, 07:41 PM | #1 |
Drives: Chevy Camaro LT1 Join Date: Apr 2022
Location: Kissimmee
Posts: 22
|
ETA
So I placed my order back on January 27th. April 7th received the notification from my dealership my allocation had been accepted. April 21st was told my TPW was May 9th. May 13th found out my car was built and was given the vin number and had no active exceptions but the eta was pending. This last Tuesday the 17th found out my car had been delayed with 1 active exception and still no eta. But today I found out there is no more exception and it has an eta of June 5th. So hopefully everything goes well in the next several weeks and I’ll finally have my car. Just a little over 5 months but it sometimes feels like longer. Especially since I’ve been wanting another Camaro for like the last 6 years.
|
05-19-2022, 08:01 PM | #2 | |
Camaros Of Northwest Ohio
|
Quote:
Bill
__________________
2023 2SS 1LE Red Hot
2016 2SS Black / Black & Arenaline Red (sold) 2023 GMC Canyon Denali 2013 2SS / RS - AGM / Jet Black (sold) 1970 1/2 Z/28 Classic Copper / Tan (sold many years ago) |
|
05-19-2022, 08:37 PM | #3 |
Drives: Chevy Camaro LT1 Join Date: Apr 2022
Location: Kissimmee
Posts: 22
|
An LT1 with the RS package Riverside Blue Metallic with black metallic rally stripes.
|
05-19-2022, 09:51 PM | #4 | |
Drives: Mazda CX-5 Join Date: Apr 2022
Location: PA
Posts: 252
|
Quote:
|
|
05-20-2022, 11:24 AM | #5 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Congrats!
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
05-21-2022, 11:24 AM | #6 |
Drives: 2010 Camaro 1LT Join Date: Apr 2022
Location: Texas
Posts: 48
|
My updated timeline, also had a tpw of 5/9
2022 1LT Shadow Gray Metallic 10-Speed Automatic V6 03-25-2022: 1100 Placed Awaiting Allocation 04-02-2022: 2000 Allocation Received Accepted by Chevrolet 4-08-2022: 3000 TPW 5/9 5-20-2022: 3800 Vehicle Produced |
|
|
Post Reply
|
|
|