Old 12-09-2022, 07:36 AM   #883
rst08tierney
Account Suspended
 
Drives: '23 2SS Rapid Blue
Join Date: Apr 2022
Location: CA
Posts: 202
Quote:
Originally Posted by BundiMan View Post
The only thing i don't like about the sunroof is that it breaks up the roof line that I love so much. But hey don't listen to the guy who got a vert and really took out the roofline all together.
Roof line looks terrible with a sunroof. They should have only gone with a Targa Top.
rst08tierney is offline   Reply With Quote
Old 12-09-2022, 08:00 AM   #884
Newcastle
 
Drives: 2022 2 SS 1LE on order ....now a 23
Join Date: Jan 2022
Location: North TX
Posts: 285
What you hate others love. I see a car without a sunroof and I think....well they couldnt afford one....lol. I prefer a comb over to a reverse mohawk. I once read you pick Nav bevause its one more box to check on a trade in. Well how is a sun roof different.
Newcastle is offline   Reply With Quote
Old 12-09-2022, 08:55 AM   #885
SMURFSUP
 
Drives: Rapid Blue 2023 2ss 1LE
Join Date: Sep 2022
Location: Niagara, Ontario Canada
Posts: 132
Quote:
Originally Posted by Newcastle View Post
What you hate others love. I see a car without a sunroof and I think....well they couldnt afford one....lol. I prefer a comb over to a reverse mohawk. I once read you pick Nav bevause its one more box to check on a trade in. Well how is a sun roof different.
i agree. To each their own.

I didnt go with one because i have had them on every vehicle and i hardly ever use it. I look at is as another thing to wear out or another thing to leak.

I plan to track my 1LE so also head room i have read was an issue with a helmet.

Depends what you plan on using your car for.
__________________
Mike

1981 Camaro Bahama Blue. 510BigBlock
2023 Rapid Blue 2SS 1LE
----------------------------------------------
1100 - 08/29/2022 ----------------------- 4000 - 11/03/2022 Vehicle Available to Ship
2000 - 09/12/2022 ----------------------- 4V03 - 11/20/2022 Estimated Delivery Date
3000 - 09/27/2022 TPW-10/24/2022 ----5000 - 11/16/2022 Arrived at Dealership
3800 - 11/03/2022 Vehicle Produced ----6000 - 12/01/2022 Customer Picked Up Vehicle
SMURFSUP is offline   Reply With Quote
Old 12-09-2022, 01:23 PM   #886
demonspeed
not afraid of the wall
 
demonspeed's Avatar
 
Drives: Camaros
Join Date: Apr 2010
Location: Pittsburgh
Posts: 2,148
Quote:
Originally Posted by Newcastle View Post
What you hate others love. I see a car without a sunroof and I think....well they couldnt afford one....lol. I prefer a comb over to a reverse mohawk. I once read you pick Nav bevause its one more box to check on a trade in. Well how is a sun roof different.
I’ve never bought a vehicle for the next owner. I went 1SS and no sunroof because I want track first and foremost, I’ve never been a gadget person, I’ve rarely if ever opened the sunroof of cars I’ve had that had one (even rarely taken t-tops out), it’s extra weight, less headroom, breaks up the lines of the car, etc.

That’s the great thing about ordering a car - one can do it however they want (within the confines of whatever GM gives us anyway). Oddly enough, though, when I see a 1LE with a sunroof I am judging them as someone who isn’t actually using their car the way it was engineered to perform
__________________
2023 1LE 1SS BCD GCF JF5 MN6 SIA SLN UQT
10/13/22: 1100
Past Camaros: 13 1LE|02 SS|01 Z28|00 SS|91 1LE|91 Z28|89 IROC-Z
demonspeed is offline   Reply With Quote
Old 12-09-2022, 02:30 PM   #887
CamaroRSOnt
 
CamaroRSOnt's Avatar
 
Drives: 2023 SS Vert
Join Date: Jan 2020
Location: Ontario
Posts: 241
Quote:
Originally Posted by BowTie-Guy View Post
The constraint list is not looking good at all. This is for target production period 1/2/23 - 1/8/23

Edit: Added the national quantities for each line in bold


ZL1 & A1Z EXTREME TRACK PERFORMANCE PACKAGE 8
ZL1 WITHOUT A1Z EXTREME TRACK PERFORMANCE PKG. 48
A1Y SS PERFORMANCE PACKAGE / WBL REDLINE EDITION 85
WBL REDLINE EDITION & GXD SHARKSKIN METALLIC 0
57V 20" CALIENTE WHEELS 57
1LT/2LT & LGX ENGINE 54
3LT 3
3LT & LGX ENGINE 3
1LZ/1SS 76
2SS 51
5VM LPO GROUND EFFECTS PACKAGE 0
RZ3 LPO FRONT SPLITTER, BODY-COLOR 0

Bow Tie can you help me understand this. I have a 2SS Vert on order.

With the 2SS column is that telling us that 51 are on order nation wide in total and that they cannot be built in that period in January or we don't know how many are on order but 51 originally slotted can't be built?

Are they building 2SS's, any idea of the quantity if they are? Someone said that Camaro's are only being built only Mon thru Thursday.



Thanks !
__________________
1978 Z28 T-Roof
1984 Berlinetta
2007 Solstice Supercharged
2014 C7 Z51
2020 RS Convertible
2023 2SS Convertible
CamaroRSOnt is offline   Reply With Quote
Old 12-09-2022, 03:16 PM   #888
BowTie-Guy
 
BowTie-Guy's Avatar
 
Drives: 2023 Silverado LT Trail Boss
Join Date: Apr 2022
Location: TX
Posts: 196
Quote:
Originally Posted by CamaroRSOnt View Post
Bow Tie can you help me understand this. I have a 2SS Vert on order.

With the 2SS column is that telling us that 51 are on order nation wide in total and that they cannot be built in that period in January or we don't know how many are on order but 51 originally slotted can't be built?

Are they building 2SS's, any idea of the quantity if they are? Someone said that Camaro's are only being built only Mon thru Thursday.



Thanks !

I would love to help you, but I don't understand any of it myself, lol. I'm just sharing what I'm able to see. Someone else may be able to help decipher what it all means. Yes, I'm sure they are still building 2SS's, but probably not many. And yes, the factory only runs Monday through Thursday.


Edit: I THINK the numbers represent how many can be built that they have all available parts for. Whether that's from now through that production week, or just for that week, I don't know. Again, just guessing.
__________________
'23 Summit White 1SS 1LE 6MT

4/28/22: 0500 (order placed)
5/10/22: 1100
7/18/22: 2000 Accepted by GM
7/19/22: 3000 Accepted by production control
9/9/22: 3100 Available to Sequence
9/9/22: 3300 Scheduled for Production
9/10/22: 3400 Broadcast
TPW: 8/29/22 ---> 9/19/22 ---> NOW 9/26/22
10/4/22: 3800 Produced
10/10/22: 4300 Intermediate Del. - Delivered 11/2
BowTie-Guy is offline   Reply With Quote
Old 12-09-2022, 03:23 PM   #889
cdb95z28


 
cdb95z28's Avatar
 
Drives: 2022 1SS 1LE A10 BCD WCT+PDR
Join Date: Mar 2008
Location: Johnstown, PA
Posts: 3,792
I believe the #s mean that is the amount of vehicles they will build in each row. A zero means none will be built in that package. Constraint means limitation, not complete stoppage or halt (unless otherwise noted with a zero).
__________________
2022 1SS 1LE A10 BCD WCT+PDR2014 1SS 1LE NPP RECARO SIM-SOLD1995 Z28 M6 GSC PGM-SOLD1975 NOVA COUPE 300HP 350 TH350 FLASH RED-SOLD
"KEEP THE FAITH"-Fbodfather
cdb95z28 is offline   Reply With Quote
Old 12-09-2022, 03:29 PM   #890
BowTie-Guy
 
BowTie-Guy's Avatar
 
Drives: 2023 Silverado LT Trail Boss
Join Date: Apr 2022
Location: TX
Posts: 196
I'm still totally confused by this (A1Y SS PERFORMANCE PACKAGE / WBL REDLINE EDITION). What does that even mean? 1LE package & Redline edition are two separate things. Why are they grouped together like that & not on separate lines? There is no such thing as a 1LE Redline edition
__________________
'23 Summit White 1SS 1LE 6MT

4/28/22: 0500 (order placed)
5/10/22: 1100
7/18/22: 2000 Accepted by GM
7/19/22: 3000 Accepted by production control
9/9/22: 3100 Available to Sequence
9/9/22: 3300 Scheduled for Production
9/10/22: 3400 Broadcast
TPW: 8/29/22 ---> 9/19/22 ---> NOW 9/26/22
10/4/22: 3800 Produced
10/10/22: 4300 Intermediate Del. - Delivered 11/2
BowTie-Guy is offline   Reply With Quote
Old 12-09-2022, 03:41 PM   #891
CamaroRSOnt
 
CamaroRSOnt's Avatar
 
Drives: 2023 SS Vert
Join Date: Jan 2020
Location: Ontario
Posts: 241
Ok, thanks! It's all clear as mud lol



My experience with my C7 is they do allocations by model , so long as they are building 2SS's then sooner or later they will get to me. The whole order and allocation process is a bit of a black hole isn't it.
__________________
1978 Z28 T-Roof
1984 Berlinetta
2007 Solstice Supercharged
2014 C7 Z51
2020 RS Convertible
2023 2SS Convertible
CamaroRSOnt is offline   Reply With Quote
Old 12-09-2022, 03:42 PM   #892
cdb95z28


 
cdb95z28's Avatar
 
Drives: 2022 1SS 1LE A10 BCD WCT+PDR
Join Date: Mar 2008
Location: Johnstown, PA
Posts: 3,792
Quote:
Originally Posted by BowTie-Guy View Post
I'm still totally confused by this (A1Y SS PERFORMANCE PACKAGE / WBL REDLINE EDITION). What does that even mean? 1LE package & Redline edition are two separate things. Why are they grouped together like that & not on separate lines? There is no such thing as a 1LE Redline edition
I think that between those two packages, there will be 85 built. I wouldn't read anymore into it.
__________________
2022 1SS 1LE A10 BCD WCT+PDR2014 1SS 1LE NPP RECARO SIM-SOLD1995 Z28 M6 GSC PGM-SOLD1975 NOVA COUPE 300HP 350 TH350 FLASH RED-SOLD
"KEEP THE FAITH"-Fbodfather
cdb95z28 is offline   Reply With Quote
Old 12-09-2022, 03:53 PM   #893
CamaroRSOnt
 
CamaroRSOnt's Avatar
 
Drives: 2023 SS Vert
Join Date: Jan 2020
Location: Ontario
Posts: 241
Quote:
Originally Posted by cdb95z28 View Post
I believe the #s mean that is the amount of vehicles they will build in each row. A zero means none will be built in that package. Constraint means limitation, not complete stoppage or halt (unless otherwise noted with a zero).

Thanks, that makes some sense to me. Worked in the auto industry a long time ago, was with a supplier to them and in and out of the factories a lot. Lots of friends that worked in the factories have a sense of their scheduling etc..

Typically they do group like models together down the line in some fashion so if you were going to build 2ss models they would know we have parts this week for 51 of them so we will run that many this week.

I guess in the end someone waiting for a car is looking for clues on how long before it gets to me, the constraints list tell us where there are bottlenecks but really nothing about order backlogs etc..

Sadly I'm still hoping rising interest rates take a few orders out of line in front of me, I would like my new Camaro by June. Who knows at this point. At least I already have one sitting in the garage unlike many who have cars on order.
__________________
1978 Z28 T-Roof
1984 Berlinetta
2007 Solstice Supercharged
2014 C7 Z51
2020 RS Convertible
2023 2SS Convertible
CamaroRSOnt is offline   Reply With Quote
Old 12-09-2022, 04:03 PM   #894
LeonardS

 
Drives: 1969 Z28,1992 Z28,1994 Z28,1999 SS
Join Date: Oct 2021
Location: Jamestown, ND
Posts: 1,154
Quote:
Originally Posted by CamaroRSOnt View Post
Thanks, that makes some sense to me. Worked in the auto industry a long time ago, was with a supplier to them and in and out of the factories a lot. Lots of friends that worked in the factories have a sense of their scheduling etc..

Typically they do group like models together down the line in some fashion so if you were going to build 2ss models they would know we have parts this week for 51 of them so we will run that many this week.

I guess in the end someone waiting for a car is looking for clues on how long before it gets to me, the constraints list tell us where there are bottlenecks but really nothing about order backlogs etc..

Sadly I'm still hoping rising interest rates take a few orders out of line in front of me, I would like my new Camaro by June. Who knows at this point. At least I already have one sitting in the garage unlike many who have cars on order.
They were not building like models together when I was at the factory in July. It was a mix of Camaros and Cadillacs, but no two were alike.
__________________
24 2SS 1LE, Riptide Blue, A10, PDR. Picked up 11/5/23, 560 miles.
23 ZLE Rapid Blue, M6. 6/27/22 TPW. Off assembly line on July 12th, 2022. To Dealer August 6th. Delivered August 8th. 129 miles.
99 SS Vert, Hugger Orange, A4, 806 miles
94 Z28, Black, M6, 595 miles
92 Z28, last car built at Van Nuys Plant, Red, A4, 125 miles www.last1992camaro.com
69 Z28, Dusk Blue, M4
29 Ford Business Coupe
28 Ford Pickup
24 GMC Denali 2500HD CCSB 4x4
22 Jeep Grand Cherokee
13 Ford F150 Crew Cab 4x4
LeonardS is offline   Reply With Quote
Old 12-09-2022, 08:55 PM   #895
CamaroRSOnt
 
CamaroRSOnt's Avatar
 
Drives: 2023 SS Vert
Join Date: Jan 2020
Location: Ontario
Posts: 241
Thanks LeanardS , anything goes then.

So they do build the Cadillac on the same line as the Camaro's? I wasn't sure of that. Any idea on the meaning of some of those constraint numbers?

I'm only two hours from the Lansing plant , too bad like the 'Vette you can't pick up your car there. I did notice you picked yours up, read the back story from your California adventure, very cool !!

Decades ago I was the boss in a truck manufacturing plant. We always built like models together but we had a lot of fleet orders. I have been in a few auto plants since and had people working on their automation systems. Gathered everything was driven by the VIN at the assembly line and it would make sense to smooth that out by grouping like orders. Been retired 15 yrs, things change.
__________________
1978 Z28 T-Roof
1984 Berlinetta
2007 Solstice Supercharged
2014 C7 Z51
2020 RS Convertible
2023 2SS Convertible
CamaroRSOnt is offline   Reply With Quote
Old 12-10-2022, 07:53 AM   #896
LeonardS

 
Drives: 1969 Z28,1992 Z28,1994 Z28,1999 SS
Join Date: Oct 2021
Location: Jamestown, ND
Posts: 1,154
Quote:
Originally Posted by CamaroRSOnt View Post
Thanks LeanardS , anything goes then.

So they do build the Cadillac on the same line as the Camaro's? I wasn't sure of that. Any idea on the meaning of some of those constraint numbers?

I'm only two hours from the Lansing plant , too bad like the 'Vette you can't pick up your car there. I did notice you picked yours up, read the back story from your California adventure, very cool !!

Decades ago I was the boss in a truck manufacturing plant. We always built like models together but we had a lot of fleet orders. I have been in a few auto plants since and had people working on their automation systems. Gathered everything was driven by the VIN at the assembly line and it would make sense to smooth that out by grouping like orders. Been retired 15 yrs, things change.
Yes, they are built on the same line. It was a random mix of Camaros and Cadillacs with no grouping of colors or models or coupe vs convertible. It appeared to be more Cadillacs than Camaros the day I was there. They are building 375 cars per day and 4 days per week.
__________________
24 2SS 1LE, Riptide Blue, A10, PDR. Picked up 11/5/23, 560 miles.
23 ZLE Rapid Blue, M6. 6/27/22 TPW. Off assembly line on July 12th, 2022. To Dealer August 6th. Delivered August 8th. 129 miles.
99 SS Vert, Hugger Orange, A4, 806 miles
94 Z28, Black, M6, 595 miles
92 Z28, last car built at Van Nuys Plant, Red, A4, 125 miles www.last1992camaro.com
69 Z28, Dusk Blue, M4
29 Ford Business Coupe
28 Ford Pickup
24 GMC Denali 2500HD CCSB 4x4
22 Jeep Grand Cherokee
13 Ford F150 Crew Cab 4x4
LeonardS is offline   Reply With Quote
 
Post Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:55 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2026, vBulletin Solutions, Inc.