10-14-2021, 05:10 AM | #71 |
Drives: ‘22 2ss Join Date: Apr 2021
Location: South Jersey
Posts: 172
|
Who else in the 3400 10/18 tpw club?! When do you guys expect we see these things if they’re built on time?
__________________
‘22 2SS A10
Last edited by JDaniels609; 10-14-2021 at 06:40 PM. |
10-14-2021, 06:45 AM | #72 |
Drives: 22 Camaro 2SS, 20 Subaru Crosstrek Join Date: Aug 2021
Location: DFW TX
Posts: 571
|
Assuming you mean 3400 status, I am I'm trying to be realistic and accepting of the transportation challenges, so I'm going with "before Thanksgiving" on the timeframe.
__________________
Earth is an oblate spheroid
2022 | 2SS | M6 | NPP | Summit White | Carbon Flash Wheels | Black Lugs | Red Calipers | Adrenaline Red | Red Knee Pads | Nav | - 1100 - 8/16/21 - 3000 - 9/21/21 - TPW 10/18/21 - 3400 - 10/1/21 - 3800 - 10/20/21 - built 10/19/21 - 5000 - 11/12/21 - 6000 - 11/13/21 |
10-14-2021, 06:55 AM | #73 |
Drives: 2022 2SS Join Date: Feb 2021
Location: Cape Cod MA
Posts: 92
|
I'm also in the 3400 10/18 club. I'm hoping for mid November to pick it up. I'm not going to wait for it to be delivered to MA which could add on a few more weeks, I'm flying out to Detroit to pick it up from Joe as soon as he has it. I've waited WAY to long not to drive it as soon as possible, and as much as possible before the winter weather sets in, LOL
__________________
The Future
2022 Camaro 2SS | RBM | A10 | NPP | MRC| Sunroof | Splash Guards - Waited 10 months total! 2/25/21 1100 (2021) - 6/25/21 order cancelled by GM. | 6/26/21 1100 (2022) Ordered from Joe this time 8/20/21 2000 | 9/8/21 3000 TPW 9/27 | 9/15/21 3000 TPW 10/18 10/1/21 3400 TPW 10/18 | 10/20/21 3800 Finally Built! 11/5/21 5000 | 12/6/21 6000 The Past 1989 Pontiac Trans Am GTA | 1976 Pontiac Formula | 1971 Pontiac Formula | 1971 Buick Gran Sport 455 | 1969 Chevrolet Camaro SS | 1969 Buick Gran Sport |
10-14-2021, 07:09 AM | #74 | |
Drives: 22 Camaro 2SS, 20 Subaru Crosstrek Join Date: Aug 2021
Location: DFW TX
Posts: 571
|
Quote:
__________________
Earth is an oblate spheroid
2022 | 2SS | M6 | NPP | Summit White | Carbon Flash Wheels | Black Lugs | Red Calipers | Adrenaline Red | Red Knee Pads | Nav | - 1100 - 8/16/21 - 3000 - 9/21/21 - TPW 10/18/21 - 3400 - 10/1/21 - 3800 - 10/20/21 - built 10/19/21 - 5000 - 11/12/21 - 6000 - 11/13/21 |
|
10-14-2021, 07:15 AM | #75 |
Drives: 2022 2SS Join Date: Feb 2021
Location: Cape Cod MA
Posts: 92
|
Yes - 850 miles so more then half way through break-in
__________________
The Future
2022 Camaro 2SS | RBM | A10 | NPP | MRC| Sunroof | Splash Guards - Waited 10 months total! 2/25/21 1100 (2021) - 6/25/21 order cancelled by GM. | 6/26/21 1100 (2022) Ordered from Joe this time 8/20/21 2000 | 9/8/21 3000 TPW 9/27 | 9/15/21 3000 TPW 10/18 10/1/21 3400 TPW 10/18 | 10/20/21 3800 Finally Built! 11/5/21 5000 | 12/6/21 6000 The Past 1989 Pontiac Trans Am GTA | 1976 Pontiac Formula | 1971 Pontiac Formula | 1971 Buick Gran Sport 455 | 1969 Chevrolet Camaro SS | 1969 Buick Gran Sport |
10-14-2021, 08:36 AM | #76 |
Drives: 2022 SS 1LE Join Date: Dec 2020
Location: Metro Detroit
Posts: 222
|
Thank you! Hang in there!
Thank you! Hang in there. Hopefully it doesn't take too long to move you along. Hopefully we can catch each other on Woodward next year!
__________________
Alpha Platform Aficionado
2022 Camaro SS 1LE | Rapid Blue | Manual Cadillac ATS 3.6 RWD | Daily Driver Previous: Challenger Scat Pack Widebody |
10-14-2021, 10:46 AM | #77 |
I'm a week behind you guys - JDaniels, JKSully, and SusieL - so I am definitely rooting for your builds to go according to schedule so that mine follows closely behind!
I'm a little more pessimistic on delivery times though based on what I've read for non-ZL1s. I'm telling myself a December delivery is more realistic. Either way I don't anticipate getting many miles until spring, although I am working on a tire swap at delivery to remove the cold temp concerns. That way if the snow doesn't fly early I may get some miles in.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
|
10-14-2021, 06:42 PM | #78 |
Drives: ‘22 2ss Join Date: Apr 2021
Location: South Jersey
Posts: 172
|
Really hope it’s not a December delivery that will be torture leaving the car just sit in my driveway through the winter. Anyone know how long the actual build process usually is?
__________________
‘22 2SS A10
|
10-14-2021, 06:45 PM | #79 |
Drives: Rapid Blue 2022 Camaro 1SS Join Date: Sep 2021
Location: Waterloo, Iowa
Posts: 204
|
have to say being stuck at 1100 is the most annoying part of this process. It can mean so many things, yet really means next to nothing at the same time.
__________________
9/9/2021 - 1100 (date of deposit)
10/15/2021 - 2000 11/4/2021 - 3100 Status TPW 11/15 11/9/2021 - 3400 Status TPW 11/15 11/24/2021 - 3800 Status built 11/21/2021 12/2/2021 - 5000 Status 12/13/2021 - 6000 Status |
10-14-2021, 08:18 PM | #80 |
I agree with that 100%. I spent 6 months in that 1000 bucket. But things have been advancing pretty steadily since I got an allocation, despite the 3 month downtime.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
|
10-14-2021, 08:22 PM | #81 | |
Quote:
https://youtu.be/i8vJkKHt_CY Presumably your sub assemblies are being build while other cars are rolling down the line. It would be very interesting to understand the full process though for sure.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
||
10-14-2021, 11:09 PM | #82 |
Drives: 2024 Black ZL1, M6 Join Date: Mar 2014
Location: Murrieta, CA
Posts: 341
|
I’m at 3400 with TPW 10/25. I expect to get mine here in SoCal around first week of Nov. my dad ordered his C8 from same dealer in April this year. Car was built 8/4 and he took delivery 8/13 here in SoCal.
__________________
|
10-15-2021, 12:17 AM | #83 |
Banned
Drives: i want a camaro Join Date: Aug 2019
Location: miami, the hottest place on earth
Posts: 407
|
are there any allocations to go around out there or the cars are on consignment
|
10-15-2021, 02:53 AM | #84 |
Drives: ‘22 2ss Join Date: Apr 2021
Location: South Jersey
Posts: 172
|
These sound like super wishful thinking but hey I’ll take it! My dealer sucks royally so im sure somehow mine will take ages to arrive.
__________________
‘22 2SS A10
|
|
|
Post Reply
|
|
|