05-05-2022, 08:13 PM | #1 |
Drives: 2022 Camaro 2SS Convertible M6 Join Date: Jan 2022
Location: Clifton Park, NY
Posts: 39
|
Optional Stripes
Does anyone know if the optional stripes (I ordered BO4, metallic black Rally Stripes) are installed during the assembly process or after the car is built. At the factory or at the dealership? I ask this because I'm wondering if it will hold up delivery of my Car. I have a TPW of 5/9.
__________________
2022 2SS Convertible 6 Speed Manual
Red Hot, Adrenaline Red interior, Dual Tone exhaust, Red painted calipers, SS Wheel centers, Sport pedal kit, Metallic Black Rally Stripes. 1/13/22 Ordered 4/19/22 2000 status 4/21/22 3000 status 4/29/22 3400 status 4/29/22 TPW 5/9/22 5/12/22 3800 status, BUILT! 5/16/22 4300 status 6/14/22 Delivered! |
05-05-2022, 08:24 PM | #2 |
Drives: 2023 1le Join Date: Apr 2022
Location: West Texas
Posts: 228
|
Stripes are done at the factory.
|
05-06-2022, 09:17 AM | #3 |
Not to contradict Big Lou, but my understanding is that stripes are applied somewhere in the Lansing/Detroit area, but not at LGR as part of the assembly line.
If you check with JoeP, he can likely give you the specifics. As I understand it (I have stripes), you car will hit 3800 (BUILT) and then very quickly go to 4200 for Intermediate Delivery for the stripes. Assume final delivery will be delayed by about 1 week for the application of stripes.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
|
05-06-2022, 12:25 PM | #4 |
Drives: 2023 1le Join Date: Apr 2022
Location: West Texas
Posts: 228
|
tommcd24 is right, if i recall they used to drive them to another place and have them installed. I was just meaning they are done up there and arrive at your dealership done.
|
05-06-2022, 12:28 PM | #5 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Same place the 1LE hood wrap is done. It's not on the assembly line, but it will potentially "delay" delivery, as that process can take up to a week or two.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
05-06-2022, 01:08 PM | #6 | |
Drives: Previous '04 SSR; '10 2SS; '16 2SS Join Date: Mar 2009
Location: Western NY
Posts: 191
|
Quote:
I ordered the center stripe on my LT1. (BTW Mighty….it’s Vivid Orange) The car was produced 1 week ago and I don’t see any shipping info yet. I’m also curious if they go off the factory site. Are they trucked there ?? Driven there ?? How far do they go ?? Inquiring minds want to know.
__________________
2022 LT1, Vivid Orange Metallic.
Order placed 1/25/22 Took delivery 5/28/22 |
|
05-06-2022, 01:30 PM | #7 | |
Drives: 23 LT1/22 Colorado TB/69 Chevelle Join Date: Jun 2006
Location: Greenville, Tx
Posts: 5,004
|
Quote:
|
|
05-06-2022, 01:38 PM | #8 | |
Drives: 2022 Camaro 2SS Convertible M6 Join Date: Jan 2022
Location: Clifton Park, NY
Posts: 39
|
Quote:
__________________
2022 2SS Convertible 6 Speed Manual
Red Hot, Adrenaline Red interior, Dual Tone exhaust, Red painted calipers, SS Wheel centers, Sport pedal kit, Metallic Black Rally Stripes. 1/13/22 Ordered 4/19/22 2000 status 4/21/22 3000 status 4/29/22 3400 status 4/29/22 TPW 5/9/22 5/12/22 3800 status, BUILT! 5/16/22 4300 status 6/14/22 Delivered! |
|
05-06-2022, 01:53 PM | #9 |
Drives: 23 LT1/22 Colorado TB/69 Chevelle Join Date: Jun 2006
Location: Greenville, Tx
Posts: 5,004
|
It's not usually much of a delay due to stripes. Available transports or rail cars is normally the culprit of long shipping times. Stripes and hood wraps are normally done in a a few days.
|
05-06-2022, 02:24 PM | #10 | |
Quote:
My car was built (3800) on Nov. 8th. Nov. 9th it was in intermediate delivery (4300). By Nov. 16th, it was at the Railyard in Toledo, OH. So one week from rolling off the assembly line, having stripes applied, and being bayed at the railyard for transport.
__________________
2SS Convertible M6 NPP Riverside Blue w/ Silver Rally Stripes
Dec. 18: took her home Dec. 9: arrival at dealer Nov. 16-29: Toledo, OH (railyard) Nov. 9: 3800 -> 4300 (for stripes) Oct. 8: 3400 status TPW 10/25 Oct. 6: 3100 status TPW 10/25 Sept. 9: 3000 status TPW 10/4/2021 Sept. 3: 2000 status (after 5 1/2 months) Sept. 2: Change Order: 2SS (V6 constraint) April 12: Reordered as ‘22 3LT RS V6 (March 16:Initial Order ‘21 3LT RS V6) |
||
05-06-2022, 04:14 PM | #11 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Mine made it through the hood wrap surprisingly fast as well
Good choice on the color :-)
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
05-06-2022, 04:28 PM | #12 | |
Drives: Previous '04 SSR; '10 2SS; '16 2SS Join Date: Mar 2009
Location: Western NY
Posts: 191
|
Quote:
This is a discussion I’ve been thinking about for a while.
__________________
2022 LT1, Vivid Orange Metallic.
Order placed 1/25/22 Took delivery 5/28/22 |
|
05-09-2022, 02:26 PM | #13 |
Drives: chrevrolet camaro Join Date: Feb 2022
Location: arlington
Posts: 6
|
hi joe i hope you having a good day i was wondering if you can check on my order my last update was 3000 code april 14 tpw 5/9 i wanna see if theres any changes order#BJZZ79 THANKS
|
05-09-2022, 02:30 PM | #14 |
Drives: 2022 VOM 2SS 1LE M6 Camaro Join Date: Nov 2021
Location: Vegas, baby...Vegas...
Posts: 816
|
Wrong thread, dude, and Joe is taking a break currently.
__________________
2022 Vivid Orange 2SS 1LE ordered (BDQDHT, 1G1FG1R7XN0108251) - ETA 20220223
20211120 - 1100 --- 20211207 - 2500 20211208 - 3000 (TPW: was 20220103, now 20220124) 20211220 - 3400 (TPW: 20220110) 20220114 - 3800 --- 20220122 - 4300 (1LE Wrap Shuffle) 20220125 - 4B00 --- 20220129 - 4200 (Shipped! ETA: 20220223) 20220212 - 4800 --- 20220216 - 6000! 2024 Silverado EV RST First Edition on reserve, as well. |
|
|
Post Reply
|
|
|