Quote:
Originally Posted by ChevyRules
SOP for 2018 MY was June 2017.
|
Al says they fixed it in production March of 17 and the TSB lists the end of 2017 production as the breakpoint. Looks like a two month overlap for a clean breaking point (MY17) or to allow an overlap.