Quote:
Originally Posted by Sven59
They produced 515 in 14 and 1292 in 15. Considering they had many sitting on the lots 750 might not be a bad number.
|
Still, though, it is a 1LE option package that doesn't seem as complex as what the build was for the Z/28 compared to a regular SS....ZL1 1LE has same powerplant, not as stripped down,...etc...
Now, it almost seems a relatively priced 1LE option package above the ZL1 is blown to the stratosphere....We'll see...