Quote:
Originally Posted by 67Builder
If we all end up with the same production day. I'm going to the plant to see if i can just sit at the end of the production line and watch these things roll off.
|
I'll join you.
__________________
17' ZL1 HBM|A10|PDR|CF Hood
12/28...Deposit Placed
2/9.......2000
2/15.....3000
2/20.....TPW 3/13/17
2/23.....3100
3/7.......3400
3/17.....3800
3/21.....4300
4/5.......4800
4/8.......5000
4/14.....6000
|