|
Small update. I was able to sit down and do the CAD/CAM for the sensor mount that will need to be welded to the tube.
The piece starts out as a roughed out waterjet cut blank that gets finished on the mill in 2 operations with no special fixture needed. Pretty cool.
Just one more piece to make (although it will require a fixture, so that will take some time) and I'll be able to weld the first couple tubes together and have a go at it.
|