Quote:
Originally Posted by Adaraas
If you're pulling the engine to do the cam upgrade you're an idiot lol.
|
I'm personally not pulling anything
However from various shops and the gm manual it calls for engine removal. If I recall my estimate sheets correctly most shops are in the 14-18 hour labor range for a cam swap utilizing engine removal.