Quote:
Originally Posted by Mawler
We are probably on the same train. I got an eta of 6/20 so hoping I can get a private offer by then.
|
I hope not lol. Better be on a train Monday. 6/20 is not only way longer than I anticipated but cutting it close I go on vacation 4 days later for a week. It shouldn't take a month from build to delivery....
__________________
My Intro Post |
My Order |
My Ordering Guide
TJCR2Q | 2SS
Red Hot|
Adrenaline Red|MX0 A8|56R Wheels|5ZU Blade Spoiler|NPP Exhaust|F55 MRC|IO6 Nav
• 4/06/16 1100 Ordered (waiting for 5ZU acceptance)
• 4/19/16 2000 Accepted with 5ZU
• 4/23/16 3000 TPW:5/16/16
• 5/06/16 3100
• 5/13/16 3400 Broadcast Sheet
• 5/24/16 3800 Vehicle Produced
• 5/25/16 4B00 Bayed
• 5/27/16 4300 Intermediate Delivery
• 7/9/16
Delivered!