Quote:
Originally Posted by Kaizer_911
Some of the order codes....
1100 Order Placed at Dealership
2000 Order Accepted by Chevrolet
2500 Order Preferenced (or "Picked Up" or "Imaged"), Sent to Production
3000 Order Accepted by Production Control
3100 Order Available to Sequence (now becomes more stable)
3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
3400 Order Broadcasted for Production (Internal Plant Order Produced)
3800 Vehicle Produced
I would think 3000 like us in this TPW would mean parts available vs 2000. I could be wrong since laborsmith is more knowledgeable on this than myself.
And yeah I've got a "few" LPOs on my order so I'm expecting a lengthy wait time as well as QC hold due to being a 50th.
|
I think it was "past 2000" that have them available, so that would match 3000. Knew I had seen something somewhere about it.
__________________
Current: '17 2SS Hyper Blue, A8, MRC, NPP
Past: '99 SS Camaro A4, '73 Camaro 383 A3
"Voices in your head are not considered insider information."
3800 Status - 6/16/16 (Built!)
6000 status - 6/29/16 (Delivered!)