View Single Post
Old 10-26-2015, 03:58 PM   #10
laborsmith


 
Drives: 1969 Corvair, 2018 Camaro T4 RS
Join Date: Mar 2009
Location: Detroit Metropolitan Area
Posts: 2,881
4200 = Shipped

That means the responsibility for the Build has been turned over to Dispatch. It normally takes from two to ten days for the Build to actually be loaded.

For Builds traveling by rail, once at the destination yard, it takes from two to ten days for the Build to go on a hauler and head toward a dealer.

These are normal patterns and so far the Gen6 is following normal patterns from when the order bank opened, to when allocations could be used, to the first TPW to the start of regular production. I see no reason why normal will change as of now.

Laborsmith
laborsmith is offline   Reply With Quote