Quote:
Originally Posted by Katech_Mike
... If you're trying to hack it together than maybe 1-2 hours.
|
I chuckled when I read this, and immediately thought of my Dad, who called every way other than the right way "shade tree engineering."
I don't believe my shop has done one of these. You can fly out and install mine on your way up the mountain to ski.
__________________
2020 ZL1LE A10.
LME LT4 390 short block, LME CID Heads, Kong E2650, FBO.
15" conversion, MT ET Street R 325/15.
100 octane: 1045hp/1055tq.
100 octane + Meth (1x10+): 1117 hp/1067 tq