Quote:
Originally Posted by JustinZL1
I completely agree all 22s should be delivered first. With that being said from a logistical standpoint I assume they load the trains based on destinations. If they don’t have enough going to an area it is probably put on hold till they do.
|
Well I assume a load west could have been arranged, seeing as my car was built in the middle of May. Car has been built and awaiting intermediate delivery/delayed for almost 3 months.