Just received this from GM. Sorry to bring more bad news folks. This is all semiconductor shortage related.
Quote:
Lansing Grand River (Chevrolet Camaro and Cadillac CT4 and CT5) will take downtime the week of May 10 and will resume production in June to support limited 2022 model year Cadillac Black Wing pre-production volume.
- Chevrolet Camaro production will be idled from May 10 through June 28.
|
This also affects Farifax Assembly(Chevy Malibu, Caddy XT4), CAMI(Equinox), Saun Luis Potosi Assembly(Equinox/Terrain) and Ramos Assembly(Blazer/Equinox).