View Single Post
Old 08-17-2019, 12:10 AM   #43
Frank237
 
Frank237's Avatar
 
Drives: Kubota 2640, 83 BMW R-65, 2017 1 SS
Join Date: Nov 2016
Location: Craig, MT
Posts: 643
Quote:
Originally Posted by ChefBorOzzy View Post
No proof whatsoever that C8 was delayed 6 months for electrical problems. Someone on a forum stating it and some media outlets running with it doesn't make it true.
Similar to the BS that the C8's were busting rear windows from the frame/body flexing from the torque. TOTALLY FALSE as per the design manager.

I think the Electrical issues are the same. They have been on this design for FIVE years. With over two years with test mules. This isn't your normal , next generation upgrade.
Frank237 is offline   Reply With Quote