|
GPI takes about two to two and three hours so if the shop is doing it for 100 bucks they misquoted you. Can’t run on AFM lifters though
__________________
Forged short block, large duration sub .600 lift Cam Motion cam, 7200 RPM fuel cut, Pray Ported Heads, 3.85 pulley D1X, stage II intercooler, DSX secondary low side, DSX E85 sensor, Lingenfelter big bore 2.0 pump, ported front cats, 60608 Borla, LT4 injectors, ZL1 1LE driveshaft and Katech ported TB, ported MSD intake, BTR valvetrain, ARP studs, ProFlow valves, PS4 tires.
|